01483 789185 - service@uies.co.uk

Pricing plans

Pricing Plans

Have you ever wondered what electricians actually do when they're testing your premises?  Should you need to concern yourself? 

At ultimate we believe you should know what you're paying for. So you have confidence in the testing company and that they have carried out the job correctly so you know that the site is safe.

We deliver this through our transparent approach. 

Take a look at the different plans we offer and choose the one right for you. Call us if would like to chat about the options available.

"You have to turn the volume up to listen. Sorry, one of Google's ideas, not ours !"

Basic

£ 8.00
  • Perfect for those companies that can demonstrate that all their electrical systems are monitored and maintained on a regular basis
  • All works will tends to be certified
  • You may have an electrician on site
  • Limited scope for more comprehensive testing due to production contraints
  • Electricity at Works Act 1989 Guidance Note 3 Compliant

Business

£12.00
  • Those customers looking to ensure that their premises are safe. Companies have tended to have regular onsite maintenance but it's often not been certified. Testing is generally done at regular intervals.
  • Ideal for those customers where their no previous testing has been carried out and a fresh start is required
  • All circuits 100% tested and verified
  • Full Commercial Report Debrief
  • Electricity at Works Act 1989 Guidance Note 3 Compliant

Premium

£14.00
  • Those customers are looking to get maximum value out of the testing process. Maintenance may have lapsed or testing not carried out at prescribed intervals.
  • hazard removal with some minor repairs
  • Unique personlised Video Debrief of Report
  • Distribution Board Schematic in DWG file format
  • Electricity at Works Act 1989 Guidance Note 3 Compliant

NEW :Enterprise

Custom
  • Companies with complex electrical infrastructure assets
  • Premium Services included
  • Dedicated Account Management
  • Online Project Collabration platform for smooth roleout.
  • Centralised Certifcate Management
  • Electricity at Works Act 1989 Guidance Note 3 Compliant

trust

01483 789052

 

We have been with Ultimate for several years for electrical testing; it’s great to have a company that reminds you of the due dates and plans the work around the busy school life. I have always found the company friendly, helpful, reliable and competitively priced.

  • CCNM-Logo
    Janet Whittaker

    School Bursar
    Christ Church Primary School

We pride ourselves on our transparent approach to testing you won't have to wade through pages and pages and electrical specifications to see what you're paying for.

Take a look below for more details of each plan 

Each Plan is based on the number of circuits on site. You need about thirty to forty circuits to take up these plans. No need to worry if you're not sure or you think you may have less, just give us a call on the number below and we'll be happy to provide a price for you

Pricing is calculated on a per circuit basis.

 

   

  • PROCESS
  • Confirm the H&S procedures particular to your company
  • Confirm the provided Risk Assessments issued are in place
  • Confirm all Business Continuity arrangements
  • TECHNICAL
  • Carry out the agreed internal inspection of main switchgear
  • Carry out external inspection of all main switchgear
  • Inspect all main bonding connections for presence and tightness
  • Check all main earth bonding is in the correct position
  • Check all main earth bonding for earth continuity
  • Conduct Visual Inspection of site to assess its main contents and look for any obvious damageor hazards
  • At the first DB check its physical condition and look for any obvious defects such as open entries and loose or inadequate cable terminations etc.
  • Switch off all loads except those controlled by RCDs and carry out a safe isolation procedure
  • Disconnect the neutral link and carry out an insulation test between all phases and neutral joined together, to earth.
  • Reconnect everything (especially the neutral link) - re-energise and test any RCDs on the board if possible
  • Carry out 20% testing on radial & Lighting circuits
  • Loop tests only on the remaining 80% of socket circuit's
  • Our Of Hours Service available
  • Full debrief of report in some cases a video will be provided
  • Discuss the requirement for the requirement of additional testing during the sample testing there find to be some unsatisfactory results
  • Carry out tests on all radial circuits
  • Carry out tests to all lighting circuits
  • Trace all unknown circuits (subject to max ten mins per circuit)
  • Provide updated distribution board charts
  • Supply and install any missing blanks (Din Rail industry standard) or grommets to any distribution boards during testing to reduce the remedial costs where available.
  • Distribution Board Schematic showing sub main circuit from Origin inc cable sizes, types device sizes in DWG & PDF file format.
  • Full Video and/orr site visit Report Debries

Basic

£8.00

  • PROCESS
  • Confirm the H&S procedures particular to your company
  • Confirm the provided Risk Assessments issued are in place
  • Confirm all Business Continuity arrangements
  • TECHNICAL -
  • Carry out the agreed internal inspection of main switchgear
  • Carry out external inspection of all main switchgear
  • Inspect all main bonding connections for presence and tightness
  • Check all main earth bonding is in the correct position
  • Check all main earth bonding for earth continuity
  • Conduct Visual Inspection of site to assess its main contents and look for any obvious damageor hazards
  • At the first DB check its physical condition and look for any obvious defects such as open entries and loose or inadequate cable terminations etc.
  • Switch off all loads except those controlled by RCDs and carry out a safe isolation procedure
  • Disconnect the neutral link and carry out an insulation test between all phases and neutral joined together, to earth.
  • Reconnect everything (especially the neutral link) - re-energise and test any RCDs on the board if possible
  • Carry out 20% testing on radial & Lighting circuits
  • Loop tests only on the remaining 80% of socket circuit's
  • Our Of Hours Service available
  • Full debrief of report in some cases a video will be provided
  • Discuss the requirement for the requirement of additional testing during the sample testing there find to be some unsatisfactory results
  • Carry out tests on all radial circuits
  • Carry out tests to all lighting circuits
  • Trace all unknown circuits (subject to max ten mins per circuit)
  • Provide updated distribution board charts
  • Supply and install any missing blanks (Din Rail industry standard) or grommets to any distribution boards during testing to reduce the remedial costs where available.
  • Distribution Board Schematic showing sub main circuit from Origin inc cable sizes, types device sizes in DWG & PDF file format.
  • Full Video and/orr site visit Report Debries

Business

£12.00

  • PROCESS
  • Confirm the H&S procedures particular to your company
  • Confirm the provided Risk Assessments issued are in place
  • Confirm all Business Continuity arrangements
  • TECHNICAL
  • Carry out the agreed internal inspection of main switchgear
  • Carry out external inspection of all main switchgear
  • Inspect all main bonding connections for presence and tightness
  • Check all main earth bonding is in the correct position
  • Check all main earth bonding for earth continuity
  • Conduct Visual Inspection of site to assess its main contents and look for any obvious damageor hazards
  • At the first DB check its physical condition and look for any obvious defects such as open entries and loose or inadequate cable terminations etc.
  • Switch off all loads except those controlled by RCDs and carry out a safe isolation procedure
  • Disconnect the neutral link and carry out an insulation test between all phases and neutral joined together, to earth.
  • Reconnect everything (especially the neutral link) - re-energise and test any RCDs on the board if possible
  • Carry out 20% testing on radial & Lighting circuits
  • Loop tests only on the remaining 80% of socket circuit's
  • Our Of Hours Service available
  • Full debrief of report in some cases a video will be provided
  • Discuss the requirement for the requirement of additional testing during the sample testing there find to be some unsatisfactory results
  • Carry out tests on all radial circuits
  • Carry out tests to all lighting circuits
  • Trace all unknown circuits (subject to max ten mins per circuit)
  • Provide updated distribution board charts
  • Supply and install any missing blanks (Din Rail industry standard) or grommets to any distribution boards during testing to reduce the remedial costs where available.
  • Distribution Board Schematic showing sub main circuit from Origin inc cable sizes, types device sizes in DWG & PDF file format.
  • Full Video and/orr site visit Report Debries

Premium

£14.00

  • PROCESS
  • Confirm the H&S procedures particular to your company
  • Confirm the provided Risk Assessments issued are in place
  • Confirm all Business Continuity arrangements
  • TECHNICAL
  • Carry out the agreed internal inspection of main switchgear
  • Carry out external inspection of all main switchgear
  • Inspect all main bonding connections for presence and tightness
  • Check all main earth bonding is in the correct position
  • Check all main earth bonding for earth continuity
  • Conduct Visual Inspection of site to assess its main contents and look for any obvious damageor hazards
  • At the first DB check its physical condition and look for any obvious defects such as open entries and loose or inadequate cable terminations etc.
  • Switch off all loads except those controlled by RCDs and carry out a safe isolation procedure
  • Disconnect the neutral link and carry out an insulation test between all phases and neutral joined together, to earth.
  • Reconnect everything (especially the neutral link) - re-energise and test any RCDs on the board if possible
  • Carry out 20% testing on radial & Lighting circuits
  • Loop tests only on the remaining 80% of socket circuit's
  • Our Of Hours Service available
  • Full debrief of report in some cases a video will be provided
  • Discuss the requirement for the requirement of additional testing during the sample testing there find to be some unsatisfactory results
  • Carry out tests on all radial circuits
  • Carry out tests to all lighting circuits
  • Trace all unknown circuits (subject to max ten mins per circuit)
  • Provide updated distribution board charts
  • Supply and install any missing blanks (Din Rail industry standard) or grommets to any distribution boards during testing to reduce the remedial costs where available.
  • Distribution Board Schematic showing sub main circuit from Origin inc cable sizes, types device sizes in DWG & PDF file format.
  • Full Video and/orr site visit Report Debries

ADDRESS

Unit 116, Railway House

Woking, GU21 5AH

PHONE

01483 789052

© 2018 Ultimate Compliance is a brand owned by Ultimate IES Limited

Privacy Policy - Cookie Policy -

Scroll Up